| TGL | DARI | MASUK | KELUAR |
| 14 Mar 2025 | Terima Hasil Tab Pelaksanaan Shalat Tarawih & Subuh | Rp 6.729.000 | |
| 14 Mar 2025 | Bayar Insentif Pelaksanaan Shalat Tarawih (15) | Rp 400.000 | |
| 14 Mar 2025 | Bayar Insentif Petugas Relawan Ketertiban Tahap I | Rp 7.350.000 | |
| 14 Mar 2025 | Bayar Beli kamera CCTV Out Door, Kabel com RG59 & Jasa | Rp 1.274.000 | |
| 14 Mar 2025 | Bayar Insentif Pelaksanaan Shalat Jum’at | Rp 950.000 | |
| 14 Mar 2025 | Terima Hasil Tab Jum’at | Rp 7.209.000 | |
| 14 Mar 2025 | Terima Hasil Tab. Buka Puasa | Rp 3.614.000 | |
| 14 Mar 2025 | Terima hasil Tab. Ramadhan | Rp 4.408.000 |